{"id":4659,"date":"2022-07-12T11:15:00","date_gmt":"2022-07-12T09:15:00","guid":{"rendered":"https:\/\/www.amarencogroup.com\/presentation-of-the-first-float-of-a-floating-and-ground-based-solar-power-plant\/"},"modified":"2023-01-24T12:05:17","modified_gmt":"2023-01-24T11:05:17","slug":"presentation-of-the-first-float-of-a-floating-and-ground-based-solar-power-plant","status":"publish","type":"post","link":"https:\/\/www.amarencogroup.com\/en\/presentation-of-the-first-float-of-a-floating-and-ground-based-solar-power-plant\/","title":{"rendered":"PRESENTATION OF THE FIRST FLOAT OF A FLOATING AND GROUND-BASED SOLAR POWER PLANT"},"content":{"rendered":"\n<p>Le 6 juillet, en pr\u00e9sence de plus d\u2019une soixantaine d\u2019acteurs, de partenaires locaux de premier plan et du Secr\u00e9taire G\u00e9n\u00e9ral de la Pr\u00e9fecture,\u00a0Amarenco Group\u00a0et\u00a0AVERGIES\u00a0ont pr\u00e9sent\u00e9 le premier flotteur de la future centrale photovolta\u00efque, lan\u00e7ant la construction d\u2019un parc solaire majeur en Lot-et-Garonne.<\/p>\n\n<p>Amarenco\u00a0et la SEM\u00a0AVERGIES, cr\u00e9\u00e9e par le syndicat Territoire d\u2019Energie Lot-et-Garonne pour intervenir sur le d\u00e9veloppement des \u00e9nergies renouvelables sur le d\u00e9partement, ont co-investi dans un parc solaire situ\u00e9 sur la commune de Montpezat d\u2019Agenais.<\/p>\n\n<p>The Longhi family, of the Longhi Concrete Company, decided to use the land of a quarry at the end of its operation to build this floating plant, the first of its kind in the Lot-et-Garonne.<\/p>\n\n<p>By developing and building this project, Amarenco has given new life to the gravel pit.<\/p>\n\n<p>Les centrales photovolta\u00efques permettent d\u2019accro\u00eetre l&#8217;acc\u00e8s \u00e0 une \u00e9nergie provenant d&#8217;une source renouvelable et donc de r\u00e9duire les \u00e9missions de\u00a0GES.<\/p>\n\n<p>We thank for their presence at this event \ufe0f\u21a9\ufe0f<\/p>\n\n<p>\u25b6\ufe0f\u00a0Michel masset, Vice-Pr\u00e9sident du Conseil D\u00e9partemental de Lot-et-Garonne<br\/>\u25b6\ufe0f Florent Farge, Secr\u00e9taire G\u00e9n\u00e9ral de la pr\u00e9fecture de Lot-et-Garonne<br\/>\u25b6\ufe0f Jacqueline Seignouret, Maire de Montpezat d\u2019Agenais<br\/>\u25b6\ufe0f Laure Longhi, propri\u00e9taire du foncier<br\/>\u25b6\ufe0f\u00a0Pascal de SERMET de TOURNEFORT, Pr\u00e9sident de la SEM Avergies<br\/>\u25b6\ufe0f La soci\u00e9t\u00e9\u00a0GenSun, en charge de la construction<br\/>\u25b6\ufe0f Olivier Carr\u00e9\u00a0(CEO Amarenco France) et\u00a0Benjamin G\u00e9n\u00e9r\u00e9\u00a0(Responsable d\u00e9veloppement sol Amarenco)<\/p>\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"531\" src=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762525.jpg\" alt=\"\" data-id=\"4641\" class=\"wp-image-4641\" srcset=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762525.jpg 800w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762525-300x199.jpg 300w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762525-768x510.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187761713.jpg\" alt=\"\" data-id=\"4643\" data-full-url=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187761713.jpg\" data-link=\"https:\/\/www.amarencogroup.com\/?attachment_id=4643\" class=\"wp-image-4643\" srcset=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187761713.jpg 800w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187761713-300x225.jpg 300w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187761713-768x576.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure><\/li><\/ul><\/figure>\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"800\" height=\"531\" src=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762391-1.jpg\" alt=\"\" data-id=\"4649\" class=\"wp-image-4649\" srcset=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762391-1.jpg 800w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762391-1-300x199.jpg 300w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187762391-1-768x510.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"592\" src=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187764616-1.jpg\" alt=\"\" data-id=\"4654\" data-full-url=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187764616-1.jpg\" data-link=\"https:\/\/www.amarencogroup.com\/?attachment_id=4654\" class=\"wp-image-4654\" srcset=\"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187764616-1.jpg 800w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187764616-1-300x222.jpg 300w, https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/07\/1657187764616-1-768x568.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure><\/li><\/ul><\/figure>","protected":false},"excerpt":{"rendered":"<p>Amarenco and SEM AVERGIES, created by the syndicate Territoire d&#8217;Energie Lot-et-Garonne to intervene on the development of renewable energies in the department, have co-invested in a solar park located in the commune of Montpezat d&#8217;Agenais.<\/p>\n<p>The Longhi family, from the Longhi Concrete Company, decided to use the land of a quarry that had been put in water at the end of its operation to build this floating power plant, the first of its kind in the Lot-et-Garonne<\/p>\n","protected":false},"author":7,"featured_media":4644,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[64],"tags":[],"class_list":["post-4659","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-category-2"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/4659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/comments?post=4659"}],"version-history":[{"count":9,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/4659\/revisions"}],"predecessor-version":[{"id":5369,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/4659\/revisions\/5369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media\/4644"}],"wp:attachment":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media?parent=4659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/categories?post=4659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/tags?post=4659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}