{"id":5078,"date":"2022-11-02T09:40:27","date_gmt":"2022-11-02T08:40:27","guid":{"rendered":"https:\/\/www.amarencogroup.com\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/"},"modified":"2025-05-26T15:49:55","modified_gmt":"2025-05-26T13:49:55","slug":"installation-of-photovoltaic-shades-saint-andre-de-cubzac","status":"publish","type":"post","link":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/","title":{"rendered":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">\ud83c\udf43\u00a0The Department of Gironde is moving towards #EnergyTransition!<\/p>\n\n<p class=\"wp-block-paragraph\">Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became the winner to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac.<\/p>\n\n<p class=\"wp-block-paragraph\">\u27a1\ufe0f\u00a0<a href=\"https:\/\/lnkd.in\/enARxs57\">https:\/\/lnkd.in\/enARxs57<\/a><\/p>\n\n<p class=\"wp-block-paragraph\">\ud83d\udd11 Amarenco favored &#8220;turnkey&#8221; for this project with the company ENERSTEEL for the construction, and piloted by Melanie LIANZON, project manager at Amarenco.<\/p>\n\n<p class=\"wp-block-paragraph\">Construction began in late 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022.<\/p>\n\n<p class=\"wp-block-paragraph\">\ud83d\udd0c This project represents a total of 1,340 m\u00b2 divided into three photovoltaic shades (250 kWp), for an annual production of 315,500 kWh, i.e. the electricity consumption of 79 households and a reduction of 16.7 t.CO2.<\/p>\n\n<p class=\"wp-block-paragraph\">What is the point of building this carpooling area?<\/p>\n\n<p class=\"wp-block-paragraph\">\ud83d\ude98 Permettre aux individus de la r\u00e9gion et de part et d\u2019autre de pouvoir laisser leurs v\u00e9hicules stationn\u00e9s en toute s\u00e9curit\u00e9 et \u00e0 l\u2019abri des al\u00e9as climatiques (pluie et soleil).<\/p>\n\n<p class=\"wp-block-paragraph\">\u2600\ufe0f The energy created through solar actually allows the Department to achieve economies of scale and reduce their carbon footprint.<\/p>\n\n<p class=\"wp-block-paragraph\">\u267b\ufe0f That&#8217;s why Amarenco Group is committed to this transition.<br\/>A pioneering project that aims to reduce the carbon footprint and promote the transition to #R&amp;E.<\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\r\n<iframe title=\"Des ombri\u00e8res photovolta\u00efques sur l&#039;aire de covoiturage de Saint-Andr\u00e9-de-Cubzac\" width=\"580\" height=\"326\" src=\"https:\/\/www.youtube.com\/embed\/dC_y0OSI3oM?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\r\n<\/div><\/figure><br>\n","protected":false},"excerpt":{"rendered":"<p>\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition!<\/p>\n<p>Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac.<\/p>\n<p>\u27a1\ufe0f https:\/\/lnkd.in\/enARxs57<\/p>\n<p>\ud83d\udd11 Amarenco favored &#8220;turnkey&#8221; for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco.<\/p>\n<p>Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022.<\/p>\n<p>Translated with www.DeepL.com\/Translator (free version)<\/p>\n","protected":false},"author":7,"featured_media":5075,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[64],"tags":[],"class_list":["post-5078","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-category-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac. \u27a1\ufe0f https:\/\/lnkd.in\/enARxs57 \ud83d\udd11 Amarenco favored &quot;turnkey&quot; for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\/Translator (free version)\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Anais\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Amarenco - Producteur ind\u00e9pendant d&#039;\u00e9nergie photovolta\u00efque\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac - Amarenco\" \/>\n\t\t<meta property=\"og:description\" content=\"\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac. \u27a1\ufe0f https:\/\/lnkd.in\/enARxs57 \ud83d\udd11 Amarenco favored &quot;turnkey&quot; for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\/Translator (free version)\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/amarenco.manitoba.fr\/wp-content\/uploads\/2021\/09\/header@2x-1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/amarenco.manitoba.fr\/wp-content\/uploads\/2021\/09\/header@2x-1.jpg\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2022-11-02T08:40:27+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-05-26T13:49:55+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac - Amarenco\" \/>\n\t\t<meta name=\"twitter:description\" content=\"\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac. \u27a1\ufe0f https:\/\/lnkd.in\/enARxs57 \ud83d\udd11 Amarenco favored &quot;turnkey&quot; for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\/Translator (free version)\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/amarenco.manitoba.fr\/wp-content\/uploads\/2021\/09\/header@2x-1.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#blogposting\",\"name\":\"Installation of photovoltaic shades \\\/ Saint-Andr\\u00e9-de-Cubzac - Amarenco\",\"headline\":\"Installation of photovoltaic shades \\\/ Saint-Andr\\u00e9-de-Cubzac\",\"author\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/author\\\/anais\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.amarencogroup.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/Capture-decran-2022-11-02-093441.jpg\",\"width\":667,\"height\":372},\"datePublished\":\"2022-11-02T09:40:27+01:00\",\"dateModified\":\"2025-05-26T15:49:55+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#webpage\"},\"articleSection\":\"Category 2, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/category\\\/category-2\\\/#listItem\",\"name\":\"Category 2\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/category\\\/category-2\\\/#listItem\",\"position\":2,\"name\":\"Category 2\",\"item\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/category\\\/category-2\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#listItem\",\"name\":\"Installation of photovoltaic shades \\\/ Saint-Andr\\u00e9-de-Cubzac\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/#listItem\",\"name\":\"Accueil\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#listItem\",\"position\":3,\"name\":\"Installation of photovoltaic shades \\\/ Saint-Andr\\u00e9-de-Cubzac\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/category\\\/category-2\\\/#listItem\",\"name\":\"Category 2\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/#organization\",\"name\":\"Amarenco\",\"description\":\"Producteur ind\\u00e9pendant d'\\u00e9nergie photovolta\\u00efque\",\"url\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/amarenco.manitoba.fr\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/favicon.png\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/author\\\/anais\\\/#author\",\"url\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/author\\\/anais\\\/\",\"name\":\"Anais\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dd293dcdc2ed1702b404ac6207c0fffdae38bdd9666591336eb2d041929f8f9e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Anais\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#webpage\",\"url\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/\",\"name\":\"Installation of photovoltaic shades \\\/ Saint-Andr\\u00e9-de-Cubzac - Amarenco\",\"description\":\"\\ud83c\\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\\u00e9-de-Cubzac. \\u27a1\\ufe0f https:\\\/\\\/lnkd.in\\\/enARxs57 \\ud83d\\udd11 Amarenco favored \\\"turnkey\\\" for this project with the company ENERSTEEL for the construction, and led by M\\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\\\/Translator (free version)\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/author\\\/anais\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/author\\\/anais\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.amarencogroup.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/Capture-decran-2022-11-02-093441.jpg\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#mainImage\",\"width\":667,\"height\":372},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\\\/#mainImage\"},\"datePublished\":\"2022-11-02T09:40:27+01:00\",\"dateModified\":\"2025-05-26T15:49:55+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/\",\"name\":\"Amarenco\",\"description\":\"Producteur ind\\u00e9pendant d'\\u00e9nergie photovolta\\u00efque\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.amarencogroup.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac - Amarenco","description":"\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac. \u27a1\ufe0f https:\/\/lnkd.in\/enARxs57 \ud83d\udd11 Amarenco favored \"turnkey\" for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\/Translator (free version)","canonical_url":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#blogposting","name":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac - Amarenco","headline":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac","author":{"@id":"https:\/\/www.amarencogroup.com\/en\/author\/anais\/#author"},"publisher":{"@id":"https:\/\/www.amarencogroup.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/11\/Capture-decran-2022-11-02-093441.jpg","width":667,"height":372},"datePublished":"2022-11-02T09:40:27+01:00","dateModified":"2025-05-26T15:49:55+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#webpage"},"isPartOf":{"@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#webpage"},"articleSection":"Category 2, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.amarencogroup.com\/en\/#listItem","position":1,"name":"Accueil","item":"https:\/\/www.amarencogroup.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.amarencogroup.com\/en\/category\/category-2\/#listItem","name":"Category 2"}},{"@type":"ListItem","@id":"https:\/\/www.amarencogroup.com\/en\/category\/category-2\/#listItem","position":2,"name":"Category 2","item":"https:\/\/www.amarencogroup.com\/en\/category\/category-2\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#listItem","name":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.amarencogroup.com\/en\/#listItem","name":"Accueil"}},{"@type":"ListItem","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#listItem","position":3,"name":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac","previousItem":{"@type":"ListItem","@id":"https:\/\/www.amarencogroup.com\/en\/category\/category-2\/#listItem","name":"Category 2"}}]},{"@type":"Organization","@id":"https:\/\/www.amarencogroup.com\/en\/#organization","name":"Amarenco","description":"Producteur ind\u00e9pendant d'\u00e9nergie photovolta\u00efque","url":"https:\/\/www.amarencogroup.com\/en\/","logo":{"@type":"ImageObject","url":"https:\/\/amarenco.manitoba.fr\/wp-content\/uploads\/2021\/09\/favicon.png","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#organizationLogo"},"image":{"@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.amarencogroup.com\/en\/author\/anais\/#author","url":"https:\/\/www.amarencogroup.com\/en\/author\/anais\/","name":"Anais","image":{"@type":"ImageObject","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/dd293dcdc2ed1702b404ac6207c0fffdae38bdd9666591336eb2d041929f8f9e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Anais"}},{"@type":"WebPage","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#webpage","url":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/","name":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac - Amarenco","description":"\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac. \u27a1\ufe0f https:\/\/lnkd.in\/enARxs57 \ud83d\udd11 Amarenco favored \"turnkey\" for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\/Translator (free version)","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.amarencogroup.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#breadcrumblist"},"author":{"@id":"https:\/\/www.amarencogroup.com\/en\/author\/anais\/#author"},"creator":{"@id":"https:\/\/www.amarencogroup.com\/en\/author\/anais\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.amarencogroup.com\/wp-content\/uploads\/2022\/11\/Capture-decran-2022-11-02-093441.jpg","@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#mainImage","width":667,"height":372},"primaryImageOfPage":{"@id":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/#mainImage"},"datePublished":"2022-11-02T09:40:27+01:00","dateModified":"2025-05-26T15:49:55+02:00"},{"@type":"WebSite","@id":"https:\/\/www.amarencogroup.com\/en\/#website","url":"https:\/\/www.amarencogroup.com\/en\/","name":"Amarenco","description":"Producteur ind\u00e9pendant d'\u00e9nergie photovolta\u00efque","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.amarencogroup.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Amarenco - Producteur ind\u00e9pendant d'\u00e9nergie photovolta\u00efque","og:type":"article","og:title":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac - Amarenco","og:description":"\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac. \u27a1\ufe0f https:\/\/lnkd.in\/enARxs57 \ud83d\udd11 Amarenco favored &quot;turnkey&quot; for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\/Translator (free version)","og:url":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/","og:image":"https:\/\/amarenco.manitoba.fr\/wp-content\/uploads\/2021\/09\/header@2x-1.jpg","og:image:secure_url":"https:\/\/amarenco.manitoba.fr\/wp-content\/uploads\/2021\/09\/header@2x-1.jpg","article:published_time":"2022-11-02T08:40:27+00:00","article:modified_time":"2025-05-26T13:49:55+00:00","twitter:card":"summary","twitter:title":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac - Amarenco","twitter:description":"\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition! Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac. \u27a1\ufe0f https:\/\/lnkd.in\/enARxs57 \ud83d\udd11 Amarenco favored &quot;turnkey&quot; for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco. Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022. Translated with www.DeepL.com\/Translator (free version)","twitter:image":"https:\/\/amarenco.manitoba.fr\/wp-content\/uploads\/2021\/09\/header@2x-1.jpg"},"aioseo_meta_data":{"post_id":"5078","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2022-11-02 08:40:27","updated":"2025-06-04 04:34:50","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.amarencogroup.com\/en\/\" title=\"Accueil\">Accueil<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.amarencogroup.com\/en\/category\/category-2\/\" title=\"Category 2\">Category 2<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tInstallation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Accueil","link":"https:\/\/www.amarencogroup.com\/en\/"},{"label":"Category 2","link":"https:\/\/www.amarencogroup.com\/en\/category\/category-2\/"},{"label":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac","link":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/"}],"_links":{"self":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/5078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/comments?post=5078"}],"version-history":[{"count":2,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/5078\/revisions"}],"predecessor-version":[{"id":8548,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/5078\/revisions\/8548"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media\/5075"}],"wp:attachment":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media?parent=5078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/categories?post=5078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/tags?post=5078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}