{"id":5078,"date":"2022-11-02T09:40:27","date_gmt":"2022-11-02T08:40:27","guid":{"rendered":"https:\/\/www.amarencogroup.com\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/"},"modified":"2025-05-26T15:49:55","modified_gmt":"2025-05-26T13:49:55","slug":"installation-of-photovoltaic-shades-saint-andre-de-cubzac","status":"publish","type":"post","link":"https:\/\/www.amarencogroup.com\/en\/installation-of-photovoltaic-shades-saint-andre-de-cubzac\/","title":{"rendered":"Installation of photovoltaic shades \/ Saint-Andr\u00e9-de-Cubzac"},"content":{"rendered":"\n<p>\ud83c\udf43\u00a0The Department of Gironde is moving towards #EnergyTransition!<\/p>\n\n<p>Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became the winner to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac.<\/p>\n\n<p>\u27a1\ufe0f\u00a0<a href=\"https:\/\/lnkd.in\/enARxs57\">https:\/\/lnkd.in\/enARxs57<\/a><\/p>\n\n<p>\ud83d\udd11 Amarenco favored &#8220;turnkey&#8221; for this project with the company ENERSTEEL for the construction, and piloted by Melanie LIANZON, project manager at Amarenco.<\/p>\n\n<p>Construction began in late 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022.<\/p>\n\n<p>\ud83d\udd0c This project represents a total of 1,340 m\u00b2 divided into three photovoltaic shades (250 kWp), for an annual production of 315,500 kWh, i.e. the electricity consumption of 79 households and a reduction of 16.7 t.CO2.<\/p>\n\n<p>What is the point of building this carpooling area?<\/p>\n\n<p>\ud83d\ude98 Permettre aux individus de la r\u00e9gion et de part et d\u2019autre de pouvoir laisser leurs v\u00e9hicules stationn\u00e9s en toute s\u00e9curit\u00e9 et \u00e0 l\u2019abri des al\u00e9as climatiques (pluie et soleil).<\/p>\n\n<p>\u2600\ufe0f The energy created through solar actually allows the Department to achieve economies of scale and reduce their carbon footprint.<\/p>\n\n<p>\u267b\ufe0f That&#8217;s why Amarenco Group is committed to this transition.<br\/>A pioneering project that aims to reduce the carbon footprint and promote the transition to #R&amp;E.<\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\r\n<iframe title=\"Des ombri\u00e8res photovolta\u00efques sur l&#039;aire de covoiturage de Saint-Andr\u00e9-de-Cubzac\" width=\"580\" height=\"326\" src=\"https:\/\/www.youtube.com\/embed\/dC_y0OSI3oM?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\r\n<\/div><\/figure><br>\n","protected":false},"excerpt":{"rendered":"<p>\ud83c\udf43 The Department of Gironde is moving towards #EnergyTransition!<\/p>\n<p>Following the call for applications launched by the Department of Gironde, Amarenco was selected and subsequently became Laureate to carry out the #photovoltaic shading project, which is located in Saint-Andr\u00e9-de-Cubzac.<\/p>\n<p>\u27a1\ufe0f https:\/\/lnkd.in\/enARxs57<\/p>\n<p>\ud83d\udd11 Amarenco favored &#8220;turnkey&#8221; for this project with the company ENERSTEEL for the construction, and led by M\u00e9lanie LIANZON, project manager at Amarenco.<\/p>\n<p>Construction began at the end of 2021, and the Saint-Andr\u00e9-de-Cubzac shaded areas were put into service this summer 2022.<\/p>\n<p>Translated with www.DeepL.com\/Translator (free version)<\/p>\n","protected":false},"author":7,"featured_media":5075,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[64],"tags":[],"class_list":["post-5078","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-category-2"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/5078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/comments?post=5078"}],"version-history":[{"count":2,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/5078\/revisions"}],"predecessor-version":[{"id":8548,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/5078\/revisions\/8548"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media\/5075"}],"wp:attachment":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media?parent=5078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/categories?post=5078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/tags?post=5078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}