{"id":8804,"date":"2026-02-03T11:06:43","date_gmt":"2026-02-03T10:06:43","guid":{"rendered":"https:\/\/www.amarencogroup.com\/?p=8804"},"modified":"2026-02-03T11:08:58","modified_gmt":"2026-02-03T10:08:58","slug":"repowering-claudia","status":"publish","type":"post","link":"https:\/\/www.amarencogroup.com\/en\/repowering-claudia\/","title":{"rendered":"Repowering Claudia"},"content":{"rendered":"\n<p><strong>We are repowering Claudia, our battery energy storage facility located in Saucats (France).<\/strong><\/p>\n\n<p>Originally designed as a 1 hour BESS, Claudia is now being upgraded to 2 hours of storage, doubling its energy capacity and significantly increasing its value for the power system!<\/p>\n\n<p>Why does it matter? Because as renewables grow, flexibility becomes just as critical as production. Longer-duration storage means better frequency control, improved balancing, and readiness for advanced grid services like grid-forming.<\/p>\n\n<p>In practical terms, the site evolves from 105 MW \/ 100 MWh to 94 MW \/ 188 MWh, extending the asset\u2019s lifetime while reusing existing infrastructure: a strong example of how repowering can combine performance and sustainability.<\/p>\n\n<p>This project is also built on solid foundations: a hybrid battery architecture (NMC &amp; LFP) to maximize safety and resilience, and a long-term public-private partnership with Caisse des D\u00e9p\u00f4ts joining the project alongside Amarenco. The debt is carried by Soci\u00e9t\u00e9 G\u00e9n\u00e9rale and Rabobank.<\/p>\n\n<p>Claudia also benefits from a long-term operating framework that provides Amarenco with strong visibility on future revenues, through a tolling agreement provided by ENGIE. This structure strengthens the asset\u2019s financial robustness and confirms the economic relevance of large-scale storage infrastructure. <\/p>\n\n<p>First battery deliveries are expected in spring 2026, with commercial operation planned for early 2027.<\/p>\n\n<p>Claudia represents more than ever a key step in building Amarenco\u2019s European storage platform to support the next phase of the energy transition.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are repowering Claudia, our battery energy storage facility located in Saucats (France).<\/p>\n","protected":false},"author":2,"featured_media":8802,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[65,2],"tags":[],"class_list":["post-8804","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/8804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/comments?post=8804"}],"version-history":[{"count":1,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/8804\/revisions"}],"predecessor-version":[{"id":8805,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/posts\/8804\/revisions\/8805"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media\/8802"}],"wp:attachment":[{"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/media?parent=8804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/categories?post=8804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.amarencogroup.com\/en\/wp-json\/wp\/v2\/tags?post=8804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}