12/07/22 - Category 2

ONE OF THE LARGEST EUROPEAN BATTERY STORAGE PROJECTS IN THE GIRONDE REGION

♻️ The Energy transition cannot be achieved without the development of innovative storage solutions for renewable energies.

🔋 In order for decarbonized energy to continuously meet consumer energy needs, it is necessary to be able to store excess energy produced to meet peak demands.

To meet this challenge, Amarenco Group is currently developing the “Claudia” project, a lithium-ion battery storage project located in Saucats in Gironde (33).

This project is the winner of the second tranche 2022-2028 of RTE’s long-term call for tenders (AOLT). It represents 50% of the battery capacity that was allocated in the AOLT.

⚡ Its power makes it one of the largest storage projects in Europe!

▶️ 105MW of total capacity controllable by RTE to ensure security of supply and power system security.

This project is being developed in partnership with Nidec Industrial Solutions, located in Roche la Molière and a pioneer in the provision of battery energy storage solutions, to build the asset.